| |
|
|
One of 4, these in ground vault lights were broken and required cast iron welding repair as well as new sections. New glass was cast and carefully sealed into the frames. The water tight flexable sealant was used.
A 2 pack epoxy paint system was applied prior to glazing. It is in a specially made box for transportation to and from site.
Client: SHFA Project manager: CBC |
|